Project Description: CAT B Fit Out of CAT A Office
Services Provided: Detailed Design under a Design and Build Contract

TAP were employed to undertake the mechanical, electrical public health services design for the CAT B fit out of 12,600m2 net Grade 1 listed office space over 6 floors.

TAP provided fully co-ordinated detailed design solution for the relocation and removal of existing redundant services and the installation of new services and equipment to suit the contract programme. The project consisted of modifications to the existing Cat A installations comprising modifications to existing “Versatemp” system, feature lighting schemes within staircases, corridor, meeting rooms, new reception and cafĂ© area.

The design of the services installation was based on the aspiration of the Client to achieve a BREEAM “Excellent” rating for the fit out works.

Project Team:

David Anslow – Director

Rhys Davies – Senior Mechanical Engineer

Lyndon Callow – Senior Electrical Engineer

Neale Fionda – Public Health Engineer

Value: Confidential