Key Facts
PROJECT: 5th Floor, 33 Kingsway, Holborn, London
SERVICES PROVIDED: M&E Building Services Design – Performance Duties
CLIENT: Shionogi
VALUE: £1M
COMPLETION: 2013
SIZE: 7,000ft2
Project Summary
TAP were employed to provide a performance duties specification and outline design proposals for the design and build CAT B fit out. The project consisted of the following:
- Relocation of existing mechanical services to suit the proposed layout.
- Adaption of existing lighting systems to serve general office areas.
- Feature lighting to conference rooms.
- AV systems to conference rooms.
- Under floor power distribution system.
- Data distribution and Wi-Fi network.
- Dedicated comms room cooling system (N+1).
- Pre-action fire protection system to comms room.